Ski Resorts News
10/09/2024
The new chairlift, Levi Six, will replace the current Taalo anchor lift number 6. The modernization of the popular Northeast Slope area began in 2021, with the reprofiling of slope 6.1, the installation of automated snowmaking, and LED lighting. The combined investments in lifts and slopes will cost over 13 million euros. The six-seater Levi Six chairlift is a highly anticipated addition to the ski resort's lift offerings and will be operational in the 2024-2025 winter season.
A First-Class Chairlift Experience
The Levi Six chairlift is almost identical to the Levi West chairlift, featuring a direct-drive motor, a floating lower frame, and it operates quietly and efficiently. The main difference from Levi West is the relocation of the drive mechanism to the upper station, improving the lift's energy efficiency and making the lower station nearly silent.
Boarding the chairlift is easy via the loading carpet, and skiers and snowboarders sit in Premium seats, which are wider and heated. Each passenger enjoys an individually contoured seat with padded individual backrests and neck supports, providing the utmost lateral support, comfort and luxury. The optimal seat geometry is based on specialized ergonomic studies, offering the best travel experience. A safety bar between the legs ensures a safe experience, especially for children.
Additionally, a transparent protective dome shields passengers from wind and snow, and the chairlift is equipped with a sway damper for added stability.
Durability and environmental protection
The 2DDD drive system (Doppelmayr Direct Drive) no longer requires gearbox oil, and hydraulic systems have been significantly reduced, focusing only on brake, emergency operation, and tensioning hydraulics. These components have been replaced with electric control motors that operate functions such as opening and closing the protective dome and gear storage. All hydraulic systems and emergency operation units have external collection basins and tanks for potential leaks.
The electric control centers are designed to be air-cooled. After installation is complete, all packaging materials will be returned to the manufacturer for recycling. Numerous transport racks and cable reels are made of steel.
The 2DDD drive system concept is more energy-efficient than a traditional drive system consisting of an electric motor and gearbox.
"Customer satisfaction is of paramount importance to us, and we actively listen to their feedback as part of our continuous service improvement efforts. The Levi Six chairlift is a highly anticipated addition. Taalo anchor lift number 6 was completed in 1989, so it's time for an upgrade. The number 6 anchor lift was the first lift I built when I started as CEO in 1988," reminisces Jouni Palosaari.
Levi Six D-Line chairlift details :
• Traction length: 1,225 m
• Elevation difference: 293 m
• Capacity: 3,000 passengers per hour
• Travel speed: 5 m/s
• Ride time: 3.24 minutes
• Number of chairs: 62
www.levi.fi/en
Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026
